TruFlux UF Rack Installation Checklist (Single Sided and Bag Filter)
Wednesday, January 9, 2013 at 10:11AM 
Wednesday, January 9, 2013 at 10:11AM 
Wednesday, January 9, 2013 at 10:04AM UF Machine Start UP Record
Customer/Location: ______________________________________
UFS SO #: ______________
Date: __________________
Field Technician: _____________
Check Installation Checklist first to make sure there are no open items to work on before the UF Machine is started up.
Design ED paint flow rate: _________gpm
Design pressure for dedicated UF Feed pump: _________psi
TigerMagEP readout: _________gpm
Design ED paint flow velocity prior to ED machine _________fps
Measured velocity with transit time/Doppler unit _________fps
Data from typical label affixed to UF Module
ED Bath Temperature: _________ F
Permeate Rate (4 Hr) for Module A _________ gpm
Permeate Rate (4 Hr) for Module B _________ gpm
Permeate Rate (4 Hr) for Module C _________ gpm
Permeate Rate (4 Hr) for Module D _________ gpm
Permeate Rate (4 Hr) for Module E _________ gpm
Permeate Rate (4 Hr) for Module F _________ gpm
Permeate Rate (4 Hr) for Module G _________ gpm
Permeate Rate (4 Hr) for Module H _________ gpm
Permeate Rate (4 Hr) for Module I _________ gpm
Permeate Rate (4 Hr) for Module J _________ gpm
Permeate Rate (4 Hr) for Module K _________ gpm
Permeate Rate (4 Hr) for Module L _________ gpm
Permeate Rate (4 Hr) for Module M _________ gpm
Permeate Rate (4 Hr) for Module N _________ gpm
Permeate Rate (4 Hr) for Module O _________ gpm
Permeate Rate (4 Hr) for Module P _________ gpm
Permeate Rate (4 Hr) for Module Q _________ gpm
Permeate Rate (4 Hr) for Module R _________ gpm
Permeate Rate (4 Hr) for Module S _________ gpm
Permeate Rate (4 Hr) for Module T _________ gpm
Inlet Pressure reading: _________ psi
Outlet Pressure reading: _________ psi
Valve Positions
Mark the gear head for V9 with a white or light colored permanent marker. Take a photo of this and post in the UF Machine Operator Notebook.
Mark the gear head for V10 with a white or light colored permanent marker. Take a photo of this and post in the UF Machine Operator Notebook.
Wednesday, January 9, 2013 at 8:28AM Please read all the instructions listed below carefully to familiarize yourself with the project before attempting to perform any of the work or unpacking any further
Required Materials and Tools:
This document is meant to be used as a guideline for changing out flow meters on the UF System to a different style.

For more information See the original manual that came with the equipment or call UFSc at the phone number shown above.